U.S. Department of Transportation
Office of the Secretary
of Transportation
DTRT57-07-R-SBIR
DOT Program Solicitation for
Small Business Innovation Research
Proposal Checklist (Appendix D)
Previous Section | Program Contents | Next Section
This is a CHECKLIST OF REQUIREMENTS for your proposal. Please review the checklist carefully to assure that your proposal meets the DOT SBIR requirements. Failure to meet these requirements may result in your proposal being returned without consideration. (See Sections III and IV.C of this Solicitation).
Do not include this checklist with your proposal.
____ 1. The proposal reflects the fact that for Phase I a minimum of two-thirds (and for Phase II a minimum of one-half) of the research and/or analytical effort will be performed by the proposing firm as required (see Sections V.H.1 and V.H.2) and the primary employment of the principal investigator (for both Phase I and Phase II) must be with the small business firm at the time of award and during the conduct of the proposed research as required (see Section I.C).
____ 2. The proposal is 25 PAGES OR LESS in length. This limitation does not apply to the additional information required by Section III.H.
____ 3. The proposal is limited to only ONE of the research topics in Section VIII.
____ 4. The proposal budget may be up to $100,000 unless otherwise indicated and duration does not exceed six months.
____ 5. The technical abstract contains no proprietary information, does not exceed 200 words, and is limited to the space provided on the Project Summary sheet (Appendix B).
____ 6. The proposal contains no type smaller than ten point font size.
____ 7. The COVER SHEET (Appendix A) has been completed and is PAGE one of the proposal.
____ 8. The PROJECT SUMMARY (Appendix B) has been completed and is PAGE two of the proposal.
____ 9. The TECHNICAL CONTENT of the proposal begins on PAGE three and includes the items identified in SECTION III.D of the Solicitation.
____ 10. The Contract Pricing Proposal (Appendix C) has been included as the last section of the proposal.
____ 11. The acknowledgement of proposal receipt card (Appendix E) should be filled out and included with the proposal package.
____ 12. The additional information on prior Phase II awards, if required, in accordance with Section III.H.
____ 13. The proposal must be received by May 1, 2007.