Volpe National Transportation Systems Center
  ABOUT RITA | CONTACT US | PRESS ROOM | CAREERS | SITE MAP
Bureau of Transportation Statistics
Intelligent Transportation Systems
National Transportation Library
Research Development & Technology
Transportation Safety Institute
University Transportation Centers
Volpe National Transportation Systems Center
Volpe Overview
Volpe's Work
Information Resources
Careers at Volpe
Business with Volpe
Community Outreach
 
Volpe Employee Directory

 

DOT logo
U.S. Department of
Transportation

Office of the Secretary
of Transportation
CLOSED - This Solicitation closed May 1, 2002. DO NOT APPLY.
Small Business Innovation Research
2002 Program Solicitation
DTRS57-02-R-SBIR

Proposal Checklist (Appendix D)

Previous Section | Program Contents | Next Section


This is a CHECKLIST OF REQUIREMENTS for your proposal. Please review the checklist carefully to assure that your proposal meets the US DOT SBIR requirements. Failure to meet these requirements may result in your proposal being returned without consideration. (See Sections III and IV.C of this Solicitation). Do not include this checklist with your proposal.

____ 1. The proposal reflects the fact that for Phase I a minimum of two-thirds (and for Phase II a minimum of one-half) of the research and/or analytical effort will be performed by the proposing firm as required (see Sections V.H.1 and V.H.2) and the primary employment of the principal investigator (for both Phase I and Phase II) must be with the small business firm at the time of award and during the conduct of the proposed research as required (see Section I.C).

____ 2. The proposal is 25 PAGES OR LESS in length. This limitation does not apply to the additional information required by Section III.H.

____ 3. The proposal is limited to only ONE of the research topics in Section VIII.

____ 4. The proposal budget may be up to $100,000 unless otherwise indicated and duration does not exceed six months.

____ 5. The technical abstract contains no proprietary information, does not exceed 200 words, and is limited to the space provided on the Project Summary sheet (Appendix B).

____ 6. The proposal contains only pages of 8 1/2" x 11" size.

____ 7. The proposal contains no type smaller than 10 point font size (except as legend on reduced drawings, but not tables).

____ 8. The COVER SHEET (Appendix A) has been completed and is PAGE 1 of the proposal.

____ 9. The PROJECT SUMMARY (Appendix B) has been completed and is PAGE 2 of the proposal.

____ 10. The TECHNICAL CONTENT of the proposal begins on PAGE 3 and includes the items identified in Section III.D of the Solicitation.

____ 11. The Contract Pricing Proposal (Appendix C) has been included as the last section of the proposal.

____ 12. The acknowledgement of proposal receipt card on the back cover of the solicitation has been detached, filled out and included with the proposal package.

____ 13. An original and four copies of the proposal are submitted.

____ 14. The additional information on prior Phase II awards, if required, in accordance with Section III.H.

____ 15. The proposal must be postmarked (or delivered to the US DOT SBIR Program Office) no later than May 1, 2002 as required (see Section VI.A). If submitted electronically, the proposal must be received by May 1, 2002, as well.

Return to Top